Niederkohr Construction

Niederkohr Construction was founded back in 1946 after 2 soldiers returned from serving in World War II. Leonard and Albert Niederkohr had no doubt that their company would stand the test of time if they worked hard, worked honest and provided the highest quality materials and workmanship. Almost 7 decades later, their work ethic is still ingrained throughout Niederkohr Construction.

Duro-Last, Inc.

Duro-Last has been the industry leader in producing custom-fabricated single-ply roofing systems, designing each roof to fit building specifications exactly, and manufacturing it under controlled factory conditions. In addition to being custom prefabricated, the Duro-Last single-ply roofing system is durable, energy-efficient, installed with no disruptions, code compliant and backed by the industry's best warranties. The Duro-Last roofing system is the best long-term investment you can make in your building. Over two billion square feet of Duro-Last membrane have been installed throughout North America.



Duro-Last® has been the industry leader in producing custom-fabricated single-ply roofing systems, designing each roof to fit building specifications exactly, and manufacturing it under controlled factory conditions.

  • prompt-AD
  • prompt-AD

Featured Project

Project Details

Sypris Technologies – Marion, Ohio
Square Footage: 34,635
The Backstory: The roof had be experiencing leaks for a long period of time. The combination of molten steel and water was cause for constant concern.

The Challenge

This particular roof section was 50’ high and was a full tear off down to the deck. We cut 30” squares and used a roof warrior to lift the squares into the carts and wheelbarrows to transport the debris to the trash chute. This project was completed during a heat wave so we kept coolers of water and used bundles of insulation to create shelter from the sun during breaks.

Safety

We used safety lines, fall protection, pitch gel, hoods, safety glasses, hardhats and hearing protection. Safety meetings were conducted daily.

The Result

The project was completed on schedule and on budget with a score of 97%!